Methodology for operational estimation of the investment attractiveness of the existing electric power generation in hard-to-reach areas modernization to the level of hybrid power installation

DOI: 10.33917/mic-3.98.2021.75-85

The article describes the main parameters affecting the economic efficiency of projects for the modernization of existing generation facilities to the level of autonomous hybrid power plants using renewable energy sources in hard-to-reach territories, an analysis is carried out and a methodology for assessing the investment efficiency of a project is obtained, key relationships between technical and economic parameters.

References:

1. Mineeva A.C. Comprehensive economic assessment of organizational and technical measures to improve the energy efficiency of mining companies // UEkS. 2017. №5 (99). pp. 22.

2. Miroshnichenko A.A. About possibility of solving the problems of power supply of autonomous consumers with the help of renewable energy sources / A.A. Miroshnichenko, E.M. Gordievsky, A.Z. Kulganatov // Bulletin of TulSU. 2019. No. 5.

3. Generation facilities in isolated and hard-to-reach territories in Russia // Analytical Center for the Government of the Russian Federation, 2020. [Electronic resource]. – Access mode: https://ac.gov.ru/uploads/2-Publications/analtika/A2.pdf (accessed: 18.05.2021).

4. Akhmetshina G.R., Ilkovskiy K.K., Kusimov M.R. Prospects for solar stations as part of autonomous hybrid power plants for the Far East region //Microeconomics. 2020. No. 2 (91). pp. 67-74.